jizz中国老师高潮喷水,国产av在线观看,玩弄人妻少妇500系列,99国精产品一区二区三区a片

Welcome to Jinan Jinli Hydraulic Machinery Co., Ltd! Our company is insured by an insurance company!                              TEL:0531-84233822   TEL:13954115865   中文版

contact us

聯(lián)系我們

TEL:0531-84233822

TEL:15550068833/13954115865

E-mail:jinliyeya@126.com

Address: Haichuang Industrial Park, Huanghe Street, Jiyang District, Jinan City

Company News

Usage and installation steps of hydraulic lifting platform

Source: Time:2020-03-14 09:02:33 views:

Usage and installation steps of hydraulic lifting platform

The usage method and installation steps of the 1137 hydraulic lifting platform. There are many details to pay attention to when using the hydraulic lifting platform. The following mainly discusses the installation steps of the hydraulic lifting platform:

1、 Compilation basis: Based on the user manual of the guide rail elevator, construction organization design, and on-site geological conditions.

2、 Preparation work before construction: (1) Inspect the work site for pits, ditches, hidden ditches, and holes, and check for high-voltage and communication lines above. If the above phenomena occur, take support measures. (2) Check for any obstacles on the entrance and exit roads. (3) The tools, toolboxes, rigging, rope buckles, safety helmets, safety belts, and other items used by various trades participating in the installation and dismantling of elevators (c ā n ji ā) shall be transported to the work site for backup.

3、 Foundation: The aluminum (Al) alloy elevator foundation has been processed by the civil construction unit (ch ǔ l ǐ).

4、 Basic requirements for safe operation: (1) Personnel involved in installation and dismantling must be familiar with the mechanical performance and structural characteristics of the elevator, and possess proficient operation and control techniques as well as the ability to troubleshoot general faults. (2) The workers involved in this work should have clear division of labor, each responsible for their own duties, with one person designated to direct the work and establish communication signals. (3) Adhere to all disciplines established to ensure safe production, carry complete safety equipment, and ensure that personnel working at heights meet the relevant regulations of the labor department. It is strictly prohibited to work under the influence of alcohol. (4) In the event of snow, rain, heavy fog, or weather with wind speeds exceeding 13 meters per second, this operation shall not be carried out. (5) The transformer power grid at the construction site shall have a transformer capacity of not less than 100KVA.

5、 Inspection after installation: (1) Recheck whether each fastening point meets the requirements, and tighten if there is any looseness. (2) Check if all components are complete and in effective condition.

6、 Installation completed:

(1) The trial operation of the crane includes trial operation, static load test, and dynamic load operation. Before the previous step is qualified, the next step of trial operation cannot be carried out. ?

(2) Clean the tools, rigging, equipment (sh è b è i), and debris on the construction site.

(3) Personnel and equipment exit the site.

{10}

Links

欧美在线精品一区二区三区不卡| 亚洲精品粉嫩小泬18p| 噜噜噜精品欧美成人av| 我在ktv被六个男人玩一晚上| 97精品国产97久久久久久免费| 亚洲精品尤物av在线观看任我爽| 老熟女重囗味hdxx70星空| 精产国品一二三产品区别图片| 男按摩师按摩奶头是正常的吗| 国产vivodeshd精品| 豆国产97在线 | 亚洲| 公的粗大挺进了我的密道| 国产精品情侣呻吟对白视频| 波多野结衣在线播放| 丰满多毛的大隂户乱| 免费无遮挡无码永久视频| 亚洲成av人片在线观看无| 被老外添嫩苞添高潮np视频| 97久久精品人人澡人人爽| 亚洲啪av永久无码精品放毛片| 果冻传媒精选麻豆二区| 麻豆xxxx乱女少妇精品| 欧美xxxxx高潮喷水麻豆| 色噜噜一区二区三区| 亚洲av无码成人精品区| 国产成年无码久久久久毛片| 激情五月综合色婷婷一区二区| 与子敌伦刺激对白播放| 无码AV人妻一区二区三区四区| 国语我和子的乱视频| 亚洲av无码乱码精品国产福利| 被迫穿丁字内裤带着震蛋出门小说| 果冻传媒在线观看九一制片厂| 国产又粗又大又硬又长又爽| 亚洲熟妇色xxxxx欧美老妇| 学生娇小嫩白紧小疼叫| 含着她的花蒂咬到高潮| 久久久久人妻一区精品色欧美| 处破痛哭a√18成年片免费| 让少妇高潮无乱码高清在线观看| 人妻av无码专区久久绿巨人|